Carrillo, P and Heavey, I (2000) UK contractors’ acquisitions strategy for Central and Eastern Europe. Engineering, Construction and Architectural Management, 7(03), 322–8.

Griffith, A (2000) Integrated management systems: a single management system solution for project control?. Engineering, Construction and Architectural Management, 7(03), 232–40.

Lahdenperä, P and Tanhuanpää, V-P (2000) Creation of a new design management system based on process optimization and proactive strategy. Engineering, Construction and Architectural Management, 7(03), 267–77.

Lam, K C, Ng, S T, Hu, T, Skitmore, M R and Cheung, S-O (2000) Decision support system for contractor pre-qualification—artificial neural network model. Engineering, Construction and Architectural Management, 7(03), 251–66.

Li, H, Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(03), 211–20.

  • Type: Journal Article
  • Keywords: cost; quality; rework; systems dynamics; time; utility theory
  • ISBN/ISSN: 0969-9988
  • URL: http://www.blackwell-synergy.com/links/doi/10.1046/j.1365-232x.2000.00151.x/abs
  • Abstract:
    Delays are an endemic feature of the construction industry. Typically, when a delay occurs in a project, the project manager often expedites progress through activity-crashing with respect to available float and time–cost relationships. An accelerated schedule is thus obtained either by prescribing overtime working hours or by procuring additional resources or a combination of both. However, excessively prolonged overtime work can generate quality problems, such as rework, and additional resources. With this in mind, there is a need for a model to assist project managers with understanding the complex nature of attaining a trade-off between overtime working and the procurement of additional resources. Thus, using system dynamics modelling, the effects of prolonged overtime work on project cost and quality are examined. To overcome project delays, several options representing various combinations of prescribing overtime work and injecting additional resources are analysed. Utility theory is then applied to determine the most appropriate solution for mitigating project delays. The modelling approach offered in this paper should be particularly useful for large projects and for projects on confined sites where potential cost savings and improved quality standards are likely to be the most significant.

Nicholas, J, Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers’ financial turnover. Engineering, Construction and Architectural Management, 7(03), 221–31.

Ofori, G and Chan, S L (2000) Growth paths of construction enterprises in Singapore, 1980–98. Engineering, Construction and Architectural Management, 7(03), 307–21.

Palaneeswaran, E and Kumaraswamy, M M (2000) Benchmarking contractor selection practices in public-sector construction—a proposed model. Engineering, Construction and Architectural Management, 7(03), 285–99.

Sarshar, M, Haigh, R, Finnemore, M, Aouad, G F, Barrett, P, Baldry, D and Sexton, M (2000) SPICE: a business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(03), 241–50.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(03), 278–84.

Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(03), 300–6.